Skip to content
Transport Services Homepage
Close Menu

About the project

We have investigated options to improve safety for pedestrians at the Huon Highway and Mountain River Road intersection.

The first stage of this project will improve pedestrian safety and access to bus stops while maintaining traffic flow on the Huon Highway.

This work will:

  • move the two current bus stops approximately 100m south of the intersection, to a straighter and flatter section of the Huon Highway.
  • install a new pedestrian island which will allow pedestrians to cross the highway in two stages, providing a safer and more manageable crossing.
  • install new street lighting to improve visibility for pedestrians and drivers.
  • install new footpaths and a road barrier to provide safe and direct access to and from the bus stops from Turn Creek and Mountain River Roads, which will help separate pedestrians from traffic.

View the concept design here.

Timing

We will be working on the Huon Highway in Grove at Mountain River Road (both directions) from Monday, 3 August to Friday, 18 December 2026, weather permitting.

Working hours will be from Monday to Friday between 7:00 am and 6:00 pm.

There may be occasional work on Saturdays between 8:00 am and 6:00 pm and on Sundays between 9:00 am and 6:00 pm if required.

Traffic changes

Lane closures will only be in place between 9:00 am and 3:00 pm on weekdays and during working hours on weekends, which may affect travel times.

All lanes will remain open outside of these hours with a reduced speed limit for the duration of the project.

Please keep to speed limits, follow the directions of traffic controllers and signs, and allow up to 15 minutes extra travel time during working hours.

Changes to bus stops

Bus services will continue to run as usual, but the following bus stops will be moved from the end of November 2026.

  • Bus stop number 7109023, near Mountain River Road heading towards Lower Longley. The replacement stop is up to 160 metres along Huon Highway towards Lower Longley.
  • Bus stop number 7109007, near Turn Creek Road heading towards Huonville. The replacement stop is up to 160 metres along Huon Highway towards Huonville.

Posters will be placed at the existing bus stops before the moves, to direct you to the new bus stop locations.

1. Frequently Asked Questions

Why did the design change folloing community feedback?

We changed the design following community feedback that told us none of the four design options would be able to address all stakeholder concerns. We have taken elements of each design to develop a solution that addresses the most urgent safety concerns raised by the community.

We looked at potential upgrades that would result in substantial changes to the intersection, which included assessing the current traffic capacity. While we acknowledge there can be some delays leaving Mountain River Road, we found that the intersection is suitable for current traffic volumes.

We also found that larger upgrade options had several flaws, including impacts to local properties and services, significant time to design and deliver, and a high cost.

Is car parking included in this design?

We will continue to investigate ways to improve parking opportunities on Turn Creek Road; however, we need to work with Huon Valley Council as the road owner. Any parking upgrades will be completed after the pedestrian and bus stop safety improvements are complete.

Why aren't you installing traffic lights or a roundabout?

These options are not being considered as part of the project.

There is a steep downhill slope at the intersection and either traffic lights or a roundabout could increase the risk of rear-end crashes, especially for trucks that might struggle to brake going downhill.

These options would also slow down traffic flow on the Huon Highway and roundabouts can be challenging for pedestrians, cyclists and large vehicles to move around.

Both options would increase the cost and timeframe for the project, and a roundabout would also require extensive land acquisition from local landowners.

Will there be any changes to the speed limit?

The speed limit at this location was reduced from 100km/h to 80km/h in late March 2025. The design and proposed safety improvements include retaining the lowered speed limit.

What other improvements are happening on the Huon Highway?

The Australian Government has committed $40 million to improve the length of the Huon Highway (between Kingston and Southport) as part of the Huon Highway Road Corridor Strategy.

The strategy includes a list of road improvement projects that will be delivered over the next 30 years and prioritises projects that will provide a safer, consistent driving environment along the highway.

2. Community consultation

Community consultation

The community was given the opportunity to provide feedback on four design options during a consultation period from May to June 2025.

The feedback received during consultation has been used to inform the finalised design.

View the Consultation and Feedback summary report.

Safety was the most frequently raised concern, with community feedback highlighting issues such as speed limits, limited visibility, and the need for safe pedestrian crossing points at the bus stops.

Funding

The Tasmanian Government has  committed $3 million to upgrade the Huon Highway/Mountain River Road intersection.

Accessibility

If you would like to find out more information and you have accessibility requirements, please contact the project team (details below).

You can find out more about Transport Services' commitment to accessibility.

Contact

Please contact the project team on 0497 387 017 or email: huonmountainriver@building.tas.gov.au